Ask for the status, then check what you heard
Take one area at a time, ask an open question (“How far are we with training?”) and say back what you heard before anyone decides. Here, a project lead reviews a sensor installation in six depots.
Listen: what is the real problem? (The equipment is late, but it now has a confirmed date.)
Maya Let’s start with hardware. Owen, how does your side of things look?
Owen Four depots are complete. The supplier missed the final-batch deadline on 29 April, but it has just sent tracking data showing delivery on 10 May.
Maya So what you’re saying is that the equipment is late, but we now have a confirmed arrival date?
Collocations for deadlines and budgets
Project English runs on fixed verb + noun pairs: you miss a deadline (not lose it) and go over budget (not pass it). In writing, “exceed the budget” also works.
- miss the deadline: “The supplier missed the 29 April delivery deadline, so installation paused.”
- fall behind schedule: “Training fell behind schedule because managers had not confirmed staff availability.”
- stay on track: “Daily installation checks helped the first four depots stay on track.”
- run into problems: “The engineers ran into problems when concrete walls blocked the signal.”
- go over budget: “The pilot went over budget when the team ordered three extra gateways.”
Present perfect or past simple?
A finished time (a date, “last week”, “in February”) needs the past simple; a present result with no finished time needs the present perfect. Reports often need both: “We spent eight thousand pounds of the reserve in February. Since then, we have stayed within the revised plan.”
- “The supplier has missed a delivery, so installation cannot continue today.” (present result)
- “So far this week, we have installed forty-two sensors.” / “We installed eighteen sensors last week.” (open vs closed period)
Questioning a decision politely
To push back and keep the discussion open, follow each phrase with evidence or a genuine question. Discuss: when should a client hear that a project will be late?
- “I take your point, but is that the only way forward?”
- “I’m not entirely convinced. Have we checked the security standard?”
- “Is that really the case? Four managers have already confirmed.”
- “That’s not an ideal solution because it removes our reserve.”
- “Sorry, but I’m not sure I agree.”
Decision, owner and checkpoint
Close by saying the decision aloud and giving each action one owner and a time. “Owns” assigns responsibility, “flag” means warn early, and a checkpoint is the date you review progress.
Maya Then our decision is to keep the 31 May launch, use the approved loan gateways and run two training sessions. Owen owns the training confirmations; I’ll review delivery tracking at noon tomorrow.
Owen Agreed. I’ll circulate the action note today and flag any change before our Friday checkpoint.
A follow-up for someone who missed the meeting
They need the result, not the minutes. Write 130–160 words in five moves and turn “tomorrow” into a date.
- Status: “We are still on track for the 31 May launch.”
- Evidence: “The supplier missed its 29 April deadline but has now confirmed delivery on 10 May.”
- Risk and response: “Training is the main open risk, so we will run two online sessions on 15 and 16 May.”
- Owners: “Owen will collect final numbers by noon on 7 May; I will review delivery tracking then.”
- Checkpoint: “Please flag any change before Friday’s checkpoint.”
Common mistakes
These make an update vague or wrong:
- “We have missed the deadline on 29 April.” With a date: “We missed …”
- “When have you finished the pilot?” Use “When did you finish …?”
- “We passed the budget.” Say “We went over budget.”
- “We are behind the schedule.” No article: “behind schedule”.
- “It will be dealt with soon.” Give a name and a time.
A 10-minute daily practice routine
Use a real project from your work.
- 3 minutes: report it in three sentences: a dated past simple, a present perfect result, a risk.
- 4 minutes: write a follow-up for someone who missed your last meeting.
- 3 minutes: say the closing lines aloud, then change the decision and the checkpoint day.
What comes next
Next, write a product proposal follow-up that separates the evidence from the limits of a pilot.